KITCHEN REMODELING CONTRACTOR IN SAN DIEGO

A trendy and fully-functional kitchen is the highlight of a house where culinary masterpieces are created and family members gather together. Thus, property owners consider remodeling if a kitchen becomes outdated or a newly bought property requires kitchen renovation to meet the requirements of new owners. Sometimes, homeowners search for a post-damage remodeling contractor if a house has suffered water damage.

In any case, kitchen remodeling represents a budget-friendly option to grade up a house and advance its value in the market. So, the first question a homeowner has while considering improvement is related to expenses.

So, the checklist below reveals a kitchen remodel cost across San Diego County, aspects influencing the total expenses of employing kitchen contractors and essential stages of a kitchen renovation.

Kitchen Remodelers in San Diego - restorationserv.com

What Is the Average Cost of Kitchen Remodeling in San Diego?

If you think of kitchen remodeling but worry about heavy expenses, you will be surprised that hiring kitchen remodelers can be quite reasonable and affordable.

The average expenditure of kitchen renewal in San Diego, California, is around $11,000 ($8,500 -$15,000) for partial renovation and $36,500 for large-scale remodeling ($24,500 – $51,800). It stands to reason that the small kitchen remodel cost is usually lower and falls into the range between $7,500 and $40,000. Obviously, grand remodel projects for larger kitchens with premium-grade fixtures are pretty costly, $80k isn’t the limit. 

What factors influence the remodel costs?

In fact, the final amount depends on multiple parameters, such as:

  • The kitchen’s size. For example, the cost of flooring depends on the square area of the kitchen; the same applies to cabinets — typically, the price is calculated per foot.
  • The scope of planned works. The cost of renewing only cabinets or flooring will be significantly lower compared to a full remodel.
  • Appliances & technologies. If you renew an outdated kitchen, you might look forward to replacing some out-of-date appliances, such as the microwave or dishwasher. Moreover, advanced technologies have helped to launch various energy-saving solutions that will help you to save on utility bills in the coming years. 
  •  Supplies and materials. Manifold options are currently available in the market, from very economical to premium-grade. Trustworthy kitchen remodelers have earned their reputation through their expertise and honesty, so if your contractor recommends a budget-friendly variant but a bit costlier than you’ve expected, reflect upon the advice as it may influence durability and maintenance.   

Think of the kitchen remodel cost as capital investment – a stylish kitchen increases the price of the property notably. Additionally, kitchen remodelers ensure custom adaptation of your kitchen’s functionality to answer your unique requirements increasing the personal value too.

post-damage remodeling contractor - restorationserv.com

What Is Included in a Full Kitchen Remodel?

Partial and full remodels differ in the scale of changes. Complete renovation means major modifications in layout and hidden connections, such as plumbing and wiring. Quite often homeowners renovate kitchens in older houses where kitchens are typically isolated and tight. Nowadays, an open-floor layout is trending: a kitchen with an island or a kitchen with a joint dining room. Generally, complete remodeling consists of:

  • Renewed layout. You can renew the design totally or partially. A trustworthy contractor can put into life your ideas or work out the design adjusted for preferences and requirements.
  • Cabinetry. A new color scheme can turn around the appearance of the old kitchen, let alone the shape and finishes of cabinets (glass-door cabinets or floating shelves can work wonders).
  • Backsplash, countertops, and flooring. A refreshed backsplash and countertops that match the new color palette can upscale the kitchen into an airy and cozy, trendy and welcoming area.
  • Plumbing, fixtures, and appliance installation. When it comes to a full remodel, plumbing and wiring are key factors to ensure the functionality and durability of the new kitchen zone. No one wants to invest money in renewal and face leaky pipe issues. Hence, it is of crucial importance to inspect a plumbing system and wiring before proceeding to design development and construction works.

Obviously, you make the design choices first, including wall, flooring, and cabinet colors, preferred materials, fixtures (sinks and faucets), lighting, etc. Experienced contractors often advise on optimal solutions in terms of supplies and materials.

How long does a remodel take?

A timeframe is another important aspect homeowners are concerned about: if you decide on struggling yourself, the project might take several months to complete as you have to split between family, job, and renovation. 

Pros can manage full kitchen remodeling much faster as they have an experienced crew for every type of work, all the required specialized equipment, and connections with reliable suppliers. On average, a kitchen renovation can take from 6 to 12 weeks, and timing depends on the project’s complexity and the condition of existing wiring and piping.   

refreshed backsplash and countertops - restorationserv.com

What Is the Right Order to Remodel a Kitchen?

Any property owner feels overwhelmed while entering a home renovation. However, kitchen remodelers come to your rescue as they manage the project from A to Z. 

The remodeling itself includes the following steps

(note: every project is unique and kitchen remodelers may change slightly the order of works)

Demolition of your old kitchen. This is the time of tearing out the worn-out kitchen. The scope of work varies depending on your plans: if you just update the cabinetry finish and replace fixtures, you won’t face full-scale demolition. For larger projects you shouldn’t be worried — experienced pros are well aware of hidden plumbing and wiring under flooring and behind cabinets.

– Plumbing and electrical works. This step includes the transition of existing plumbing and the addition of new piping if required. All rough-in work with walls is also carried out in this stage. Upon completion, the official inspection is usually held. In most cases, pros know the building codes of the area well and handle all the required permits and inspections. 

Wall finishing. Once the inspection has been completed, the crew begins working with the walls according to the plan. This includes drywall installation.

 Installation of windows and doors. If the new layout doesn’t include changes in windows or doors, this step can be skipped. However, you may want to refresh or change the paint color or improve the insulation. 

 Flooring installation. Actually, contractors differ in their opinion of the best time for flooring. Some opt for installing flooring before the cabinetry, while others handle flooring once the cabinets are in place. The decision also depends on the specific project and flooring type.

Cabinetry, countertop, and fixtures installation. This might be the most interesting and joyful part of remodeling as an owner can see how the kitchen takes shape and changes its appearance.

Lighting. Once all the wiring is ready and the cabinets are in place, it’s time to complete the lighting scheme.

Installation of appliances. This step complements and finalizes cabinet installation. All appliances, such as a built-in stove, microwave, water filter, or wine chiller, can finally be connected. The kitchen takes its planned shape, and the project is near to being completed. Upon completion of this stage, the crew cleans up the space preparing your kitchen for the final inspection.

– Final inspection

The next step is a celebration. The renewed kitchen deserves a party, be it a small only-family celebration with your favorite dishes or a larger party with friends, enjoy!  

restoration and remodeling services - restorationserv.com

What Does a Kitchen Remodeling Contractor Do?

The secret of the successful project is close cooperation between customers and kitchen contractors. The crew will address all your demands and needs and can develop a custom plan to let your dreams come true.

Typically, the renovation process consists of the following stages:

  1. Answering questions. When you call a contractor, you definitely have a myriad of questions. So, answering questions is a crucial aspect of Contractor-Client communication.
  2. Project estimation. Potential clients can request a free online quote or ask for a free estimation on-site with no obligations. 
  3. The signing of the contract. A contract is important as it declares the liabilities of both parties (client-contractor). 
  4. Getting permits (if required). Experienced local contractors know the existing building codes well and take care of all required permits.
  5. Execution of works. A contractor is responsible to carry out work within the agreed timeframe. However, an unexpected issue, such as a leaky pipe or worn-out cable, can interfere with the process. 
  6. Clean up. Once the project is completed, the crew will get rid of debris and clean up the renewed space.
  7. Final inspection.  

Re-Store Service is a San Diego-based remodeling contractor. Fully licensed, we offer a wide range of restoration and remodeling services. Available 24/7, the team provides emergency repair services throughout San Diego County. Whether you reside in La Mesa, Del Mar, or Carlsbad, call us or request a free online quote — the experienced and skilled crew will renovate your home making it a true masterpiece.

For detailed information, visit Re-Store Services – Kitchen Remodeling.